Buru Energy has reached an agreement to assume ownership of Roc Oil’s 50 per cent interest in the Canning Basin exploration permits EP 428, EP 436 and EP 391 (the farm-in permits) in Western Australia.
Read More
The 13 3/8’ diameter surface casing was set and cemented to a measured depth of 799m last weekend.
Following pressure testing of the casting to Read More
Initiated on December 7, the operation lasted just over 39 hours. The 46 stage frac program placed over 1300 tonnes of proppant into the Rex formation. The next phase of the program (flowback and testing),
Read More
Lendlease, a global construction and engineering firm, needed a digital solution to manage a major rail infrastructure upgrade project in Melbourne, Australia.
Read More
The well is 15km east of the Waitsia gas field and directly on trend with the recent West Erregulla-2 gas discovery which, as recently reported by Strike Energy, has 2C contingent resources of 1.19 Tcf
Read More
The Cebu Island operations included re‐entering the cased section of the well and drilling out the two cement plugs which revealed gas had circulated out of the hole. The well was cleaned out to a depth
Read More
The 30,000 km2 release is one of Queensland’s largest ever and more than 30 per cent of the land has been reserved for domestic supply.
The area is spread across six basins – Bowen, Surat, Galilee, Read More