Basin review, Bonaparte Basin, Offshore, Projects

Blacktip gas goes into production

The Blacktip Gas Field will bring gas onshore via a 110 km offshore pipeline to supply Northern Territory’s Power and Water Corporation, with supply rising to 18,000 barrels of oil equivalent per day for 25 years.

Gas will be piped to a gas processing facility plant at Wadeye and then transported to the existing Amadeus Basin to Darwin Pipeline via APA Group’s 280 km Bonaparte Gas Pipeline.

Leave a Reply

© All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

JOIN OUR NEWSLETTER

JOIN OUR NEWSLETTER
Close