Arrow steps up CSG operations in QLD

Approximately 1,500 production wells and associated infrastructure will be developed in an area adjacent to Arrow’s existing Surat fields. Investment exceeding $1.5 billion will be made by Arrow
Read More

A new phase of gas plays

Onshore Western Australia Earlier this year, Greenpower commissioned a study that identified coal seam gas (CSG) prospects in the northern part of its EP 447 tenement, located in the Perth
Read More

Potential Icon-ic CSG find in SA

Icon Managing Director Ray James said that wireline log data from the Wakefield-1 well, located within PEL 218, indicate a series of coal sections in the Winton formation totalling 8.9 m, with gas shows
Read More

The gas advantage – drilling CSG

In 2006, Easternwell and Santos entered into a joint venture with an aim to drill approximately 750 coal seam gas (CSG) wells in the Surat Basin. Easternwell was unable to source rigs that were tailored
Read More

Clarke installs at Wilga Park

In July Clarke Energy completed commissioning of the first coal seam gas (CSG) fuelled 3 megawatt (MW) engine for Eastern Star Gas’ Wilga Park Power Station expansion. Eastern Star Gas is planning
Read More

Boomin’ Bowen

The Surat-Bowen Basin comprises two major zones; the southern Bowen Basin and Surat Basin in southern Queensland, and the northern Bowen Basin, which extends to Townsville. According to the Queensland
Read More

Epic expansion to transport QLD CSG

Epic Energy completed an expansion of its South West Queensland Pipeline (SWQP) earlier this year, with the construction of the 180 km QSN Link. However, increased activity at Queensland’s coal seam
Read More