Wire line logs and drill seam tests have been carried out over four zones of interest in the cored sequence.
The coring rig has been released from the Peebs-1 location and is being prepared to be moved
Read More
Galilee drilling update: Eastern Corporation
Muttaburra-2, the first of seven coreholes to be drilled across ATP 529P, has reached a total depth of 1088.9 metres. The well has been plugged and abandoned, and its cores have been dispatched for testing.
Eastern
Read More
Read More
Arrow delivers CSG exploration and appraisal report card
In a report, Arrow detailed “excellent progress”? on its $300 million Australian exploration and appraisal program.
The company noted excellent pilot well flow rates from the Moranbah coal
Read More
Read More
Climate change on the agenda at FutureGAS 2010
Ms Garner co-authored the first climate change law textbook in Australia entitled “Global Climate Change: Australian Law and Policy”, and has expertise in all aspects of climate change law,
Read More
Read More
Bow raises capital for Blackwater gas-fired power
Bow Energy Chief Executive Officer John De Stefani said that feedstock for the new power plant would
Read More
Read More
Turbine synchronised to grid at Darling Downs
The 120 megawatt gas turbine is one of three to be synchronised as part of the commissioning phase, which will extend over coming months.
The synchronisation follows completion of the 205 kilometre Wallumbilla
Read More
Read More
Bow raises capital to accelerate CSG developments
Managing Director Ron Prefontaine said that the $36 million was part of a total $95 million raised by institutional investment, share purchase plan and cash on hand, and would be used to fund the acceleration
Read More
Read More
APLNG awards CSG pipeline contract
The scope of the works includes the design, engineering and construction of the pipeline to transport coal seam gas (CSG) from the Surat and Bowen basins to a proposed LNG processing site located at Laird
Read More
Read More
Phase 6 works begin at Origin’s Spring Gully CSG development
The next phase includes the continuation of civil works at the Taloona and Strathblane gas plants and the delivery of three new compressors to the plant sites.
Origin intends to drill a further 31 wells,
Read More
Read More
Total depth for Bow in Bowen Basin CSG wells
Initial testing results on the well, located in the Blackwater CSG field, indicate low permeability with Bow now developing a well completion methodology to compensate for the results.
Also within the
Read More
Read More