“The economic footprint of the oil and gas industry goes far beyond its production wells and eight liquefied natural gas …

“The economic footprint of the oil and gas industry goes far beyond its production wells and eight liquefied natural gas …
Part of Galilee’s Glenaras Gas Project in ATP 2019 (formerly ATP 529) in the Galilee Basin in Queensland, the Glenaras-10L …
Speaking at Woodside’s annual Investor Briefing Day yesterday, Mr Coleman said, “They’re going to have to be really quick because …
In a statement released by Santos, it rejected the bid “on the basis that it does not represent a full …
Spudded last night, the well is being drilled by Ensign Australia using its Ensign 932 drilling rig. The well aims …
Drilling operations have indicated the presence of gas saturated Permian Toolachee and Patchawarra formations at the Tamarama-3 well. The petrophysical …
Effective immediately, the two-year contract extends an agreement in place since 2015 and will continue to be delivered by Wood …
The three AN’s are required to commence its Pre-Commercial Demonstration (PCD) stage of the Leigh Creek Energy Project (LCEP) in …
Speaking at the conference yesterday, Chevron Australia Managing Director Nigel Hearne said a pipeline running from Woodside’s Scarborough field through …
Speaking at the conference in Adelaide yesterday, Mr Gallagher said the industry needs to be willing to fight to show …