Screw compressing on show

Howden Australia, together with its screw compressor design and manufacturing colleagues from the United Kingdom, delivered two days of technical seminars in Brisbane in August. With more than 50 attendees,
Read More

Arrow steps up CSG operations in QLD

Approximately 1,500 production wells and associated infrastructure will be developed in an area adjacent to Arrow’s existing Surat fields. Investment exceeding $1.5 billion will be made by Arrow
Read More

A new phase of gas plays

Onshore Western Australia Earlier this year, Greenpower commissioned a study that identified coal seam gas (CSG) prospects in the northern part of its EP 447 tenement, located in the Perth
Read More

Potential Icon-ic CSG find in SA

Icon Managing Director Ray James said that wireline log data from the Wakefield-1 well, located within PEL 218, indicate a series of coal sections in the Winton formation totalling 8.9 m, with gas shows
Read More

Gas-to-electricity generator goes on show

The BlueGen unit is approximately the size of a dishwasher and can produce up to 17,000 kilowatt hours of power a year – twice the electricity needed to power an average home. The unit will be connected
Read More

The gas advantage – drilling CSG

In 2006, Easternwell and Santos entered into a joint venture with an aim to drill approximately 750 coal seam gas (CSG) wells in the Surat Basin. Easternwell was unable to source rigs that were tailored
Read More