The Sole-3 testing was undertaken over a 26 hour period on the 97 m completed section of the Top LaTrobe Group sandstone reservoir. Cooper said the flow-back performance and gas composition were both consistent with pre-drill expectations. Further analysis of data collected during the test confirmed Sole-3 has the capability to produce above the maximum …