, , , , , , , , , , , ,

Sole drilling progresses

The progress of Sole-3 has been affected by interruptions brought by heavy weather, With Cooper deciding to batch drill the top-holes of Sole-3 and Sole-4 to optimise workflow. This decision is expected to reduce the duration of operations for Sole-4. Sole-3 has been drilled to a total depth (TD) of 1,215 m measured depth below …

To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend