The progress of Sole-3 has been affected by interruptions brought by heavy weather, With Cooper deciding to batch drill the top-holes of Sole-3 and Sole-4 to optimise workflow. This decision is expected to reduce the duration of operations for Sole-4. Sole-3 has been drilled to a total depth (TD) of 1,215 m measured depth below …