The 97 m near-horizontal reservoir section of the well has now been completed, with the production string being installed and testing and preparations for well flow back to commence soon.
The well is expected
Read More
APA to develop Crib Point pipeline
The CPPP is estimated to cost between $160 and $200 million, with the transaction still subject to a final investment decision (FID) from AGL on the development of a LNG floating storage regasification
Read More
Read More
Iona upgrade underway
The storage expansion project involves drilling an additional well at Iona, which will help secure more reliable natural gas supplies and mitigate short-term price peaks, such as in winter.
Underground
Read More
Read More
APLNG scheduled for shut down
Maintenance works on half of the train will be undertaken from July 17 to July 22, followed by two similar outages on August 21-26 and September 11-17.
The AEMO notice states that the shutdown will affect
Read More
Read More
Real Energy completes diagnostic fracture injection test
The DFIT derives stress and reservoir parameters for fine tuning or optimisation of the fracture stimulation design and completion.
Real reported the data from the test is consistent with pre-drill assessments,
Read More
Read More
Senator calls on Morrison to block CKI bid for APA
The Australian reported the Central Alliance crossbencher believes the $13 billion bid by the Hong Kong-based group Read More
AIE terminal gets government backing
The award of CSSI status was warmly welcomed today by Andrew Forrest AO, the lead investor in the Australian Industrial Energy consortium (AIE), which is developing the PKGT.
“Today’s announcement
Read More
Read More