Woodside Energy has entered into a sale and purchase agreement to acquire Cairn Energy’s entire participating interest in the Sangomar oil development offshore Senegal.
Read More
Cairn set to sell Sangomar interest to Woodside
Woodside has exercised its right to pre-empt the sale of Cairn Energy’s interests in the Sangomar oil development offshore Sénégal to LUKOIL.
Read More
Mira begins production
The Mira-6/2 horizontal-vertical well combination was brought online by APLNG in December last year and commenced producing gas after two days.
This combination and the other three vertical wells (Mira-3,
Read More
Read More
Mira production steadily increasing
Since the last operation update, Comet Ridge says the pump speed has been increased slightly while the gas rate has continued its steady climb, recently passing 390,000 scf/d with a strong upward trend.
“All
Read More
Read More
Glenaras drilling update
Drilling of the Glenaras-10 well begun on 23 March, with the vertical test hole reaching a total depth of 1,083 measured depth (MD) and intersecting a total of 29 m of net coal in the Betts Creek Beds.
The
Read More
Read More
Glenaras drilling well underway
The well was logged and tested over various seams to assist selection of the coal target and wellpath designs for the lateral wells.
The Glenaras-10 vertical well intersected a total of 29 m of net coal
Read More
Read More
Santos snaps up Bowen acreage
Located 65 km north of Injune in the state’s southwest, the 86 square kilometre permit holds significant gas resources that have been earmarked for the domestic market.
“This area holds significant
Read More
Read More
Santos delivers Scotia
Initial full field production exceeds 40 TJ/day, in line with expectations.
The project, situated in the Bowen Basin, 340 km northwest of Brisbane, will supply about 70 TJ/d at peak production in late
Read More
Read More
FID reached for Arcadia
The $400 million Arcadia investment is in addition to the $900 million invested in upstream developments in the Maranoa, Western Downs, Central Highlands and Banana regions of Queensland this year.
“The
Read More
Read More
Glenaras skids installed
Concurrent with drilling operations, all surface facility skids have been constructed, while the water production flowline connecting the Glenaras multilateral pilot program to the existing 450 ML water
Read More
Read More