The large quantity of light oil at the Pavo-1 well will be a key factor in mobilising the Dorado project, Carnarvon Energy announced. Adrian Cook, the managing director and CEO of Carnarvon said the company
Read More
Santos awards Atteris Dorado subsea contract
Atteris has secured the subsea front-end engineering design feed (FEED) for the Dorado development by Santos in the Bedout Sub-Basin, Western Australia. The engineering design work will include flow assurance
Read More
Read More
Sembcorp secures Dorado project contract
Sembcorp Marine Rigs & Floaters has secured a contract from Altera Infrastructure GP LLC, to undertake the front-end engineering design (FEED) work for the floating production, storage and offloading
Read More
Read More
Santos awards Sapura Dorado contract
Santos has awarded the front end engineering design (FEED) contract for the design, construction and installation of the Dorado project’s wellhead platform (WHP) to Sapura Energy. The WHP will be an
Read More
Read More
Santos hits half-year production record
Santos has announced its half-year results for 2021, reporting record production of 47.3 million barrels of oil equivalent (mmboe) and record sales volumes of 53.8 mmboe. Managing director and chief executive
Read More
Read More
Dorado, Buffalo excel during quarter: Cook
Carnarvon Petroleum reached a number of milestones during the second quarter of 2021, with it commencing front-end engineering and design (FEED) activities for the Dorado oil development, edging the project
Read More
Read More
Santos reveals scope of next Dorado contract
Santos has opened the tender process for a contract to provide drilling fluids at the Dorado joint venture project offshore Western Australia.
Read More
Santos unveils next Dorado contract opportunity
Santos has opened the tender process for a contract to provide drilling fluids at the Dorado joint venture project offshore Western Australia. The scope of the contract covers 10 offshore development
Read More
Read More
Carnarvon on track for Dorado FEED phase
Carnarvon Petroleum expects front end engineering design (FEED) work at the Dorado joint venture project in Western Australia to commence shortly following appraisal results.
Read More
Read More
Carnarvon prepares for Dorado FEED phase
Carnarvon Petroleum expects front end engineering design (FEED) work at the Dorado joint venture project in Western Australia to commence shortly following appraisal results. Company chairman Peter Leonhardt
Read More
Read More