Greater Sunrise dispute settled

Conciliation proceedings were conducted by the Permanent Court of Arbitration in Kuala Lumpur, Malaysia, on the 25 February 2018. The …

Glenaras drilling well underway

The well was logged and tested over various seams to assist selection of the coal target and wellpath designs for …

AWE farms out NZ permit

The permit is located southeast of New Plymouth in a prolific gas producing region, and includes the planned Kohatukai-1 well. …

Santos snaps up Bowen acreage

Located 65 km north of Injune in the state’s southwest, the 86 square kilometre permit holds significant gas resources that …

Glenaras drilling update

Drilling of the Glenaras-10 well begun on 23 March, with the vertical test hole reaching a total depth of 1,083 …

Santos delivers Scotia

Initial full field production exceeds 40 TJ/day, in line with expectations. The project, situated in the Bowen Basin, 340 km …

Glenaras skids installed

Concurrent with drilling operations, all surface facility skids have been constructed, while the water production flowline connecting the Glenaras multilateral …

JOIN OUR NEWSLETTER

JOIN OUR NEWSLETTER
Close