Lockyer Deep-1 operator Energy Resources is preparing to perforate the well in order to begin production testing and obtain a …

Lockyer Deep-1 operator Energy Resources is preparing to perforate the well in order to begin production testing and obtain a …
Site works have been completed at EP 447 by joint venture (JV) operator Strike Energy, in preparation for the arrival of …
The proposed Narrabri Gas project, located in North West NSW, could supply up to 50 per cent of NSW gas …