Dorado-1 drilling set to begin

The Dorado-1 exploration well has a number of targets: The primary target is the proven Caley Sandstone, which the JV estimates to contain a prospective mean resource of 545 Bcf of gas and 31 MMbbl of
Read More

Quadrant updates Belgravia prospect

In its December 2017 quarterly report, Woodside Energy as operator of Swell-1 announced that the well had intersected interpreted gas sands across a large gross interval of approximately 450 m. Swell-1
Read More

Dorado-1 drilling underway

Since arriving on site, the rig successfully completed the ready to operate process, drilled the 36 inch (914.4 mm) conductor hole, finished running and cementing the 30 inch (762 mm) surface casing and
Read More