Santos gets ready for Bayu-Undan decommissioning

Santos has submitted an environmental plan to the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for the decommissioning of a pipeline between the Bayu-Undan platform and the Darwin liquified natural gas (DLNG) plant.
Read More

Glenaras drilling update

Drilling of the Glenaras-10 well begun on 23 March, with the vertical test hole reaching a total depth of 1,083 measured depth (MD) and intersecting a total of 29 m of net coal in the Betts Creek Beds. The
Read More

Glenaras skids installed

Concurrent with drilling operations, all surface facility skids have been constructed, while the water production flowline connecting the Glenaras multilateral pilot program to the existing 450 ML water
Read More

Glenaras closing in on production

Part of Galilee’s Glenaras Gas Project in ATP 2019 (formerly ATP 529) in the Galilee Basin in Queensland, the Glenaras-10L and -12L multilateral drilling campaigns were completed by the Easternwell
Read More