Arrow overhauls Surat gas project plans

The Arrow Energy joint venture is proposing to drill an additional 280 wells and construct a 440km pipeline as part of the Surat gas project in south-west Queensland.
Read More

Arrow revamps Surat gas project plans

The Arrow Energy joint venture is proposing to drill an additional 280 wells and construct a 440km pipeline as part of the Surat gas project in south-west Queensland. Arrow, which is a 50-50 joint venture
Read More

Beach increases production target

Strong operating performance also underpins Beach’s decision to increase standalone FY18 production guidance to 10.6-11.0 MMboe, up from the previous guidance of 10.0-10.6 MMboe. Beach’s production
Read More