Rig mobilises to Cervantes-1

Metgasco has confirmed that the Ensign 970 drilling rig has been released by the previous Perth Basin operator and is moving to the Cervantes-1 location.
Read More

Metgasco lines up big year of drilling

Metgasco, on behalf of the Cooper Basin ATP 2021 joint venture, has elected to prioritise work to assess the resource upside of the Vali gas field and surrounding area in Queensland.  As a result, this
Read More

Mooring installation underway at Ichthys

The pile, measuring about 66 m long and weighing more than 450 t, was driven into the seabed in a water depth of 250 m. Ichthys Project Managing Director Louis Bon said that installation of the complex
Read More

Wood Group awarded FLNG contract

Effective immediately, Wood Group Kenny (WGK) will progress the configuration design of the flexible risers and umbilicals for the asset’s offshore gas-condensate fields – Brecknock, Calliance
Read More

Wood Group wins Shell Prelude FLNG contract

Perth-based Wood Group Kenny will provide specialist consultancy services for flexible riser integrity management prior to and during operation of Prelude FLNG, which will be located 475 km north-north
Read More