In 2022, Santos accepted a binding a conditional offer from Kumul Petroleum Holdings to acquire a 5 per cent interest in PNG LNG. Kumul has now extended the offer period until 31 August 2023.
Read More
Santos, in collaboration with the University of Adelaide, Co2CRC and the Department of Foreign Affairs and Trade, provided an informative three-day carbon capture and storage (CCS) course in Dili, Timor-Leste.
Read More
Santos has partnered with Black Cat Civil and Origin Construction Group, with both companies contracted for works throughout Santos’ Queensland GLNG field operations. Read More
Santos has awarded Altrad Services a contract for its Moomba Electrification Phase 1 (MEWP1) Low Low Pressure (LLP) Facility construction project. Read More
Santos’ energy transition business Santos Energy Solutions is progressing with its ambition to create a cleaner energy future by entering an agreement with Osaka Gas Australia (OGA) for pre-front end engineering and design (FEED) work.
Read More
JERA, a subsidiary of Tokyo Electric Power Group and Chubu Electric Power Group, has secured the 12.5 per cent sale in the Barossa project from Santos. The sale saw
Read More
The National Offshore Petroleum Titles Administrator (NOPTA) has agreed to grant the joint venture a life-of-field production licence (PL) for the four blocks containing the Dorado field. The joint venture,
Read More
Santos and Carnarvon Energy have confirmed the Pavo-1 exploration well has a significant oil discovery 46 kilometres east of the Dorado field in the Bedout Sub-Basin, offshore Western Australia. The
Read More
The National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has approved the Mutineer Exeter cessation of production (CoP) environmental plan from Santos. Santos, which is Australia’s
Read More
Santos, the operator of EP 161 permit within the Beetaloo Basin, has advised on a 17 per cent increase to the previously reported gas flow rates from Tanumbirini 2H (T2H) and T3H. Read More