Glenaras skids installed

Concurrent with drilling operations, all surface facility skids have been constructed, while the water production flowline connecting the Glenaras multilateral pilot program to the existing 450 ML water
Read More

Leigh Creek closer to first gas

Leigh Creek is moving forward with the Pre-Commercial Demonstration (PCD) stage of the LCEP, with the second AN approved being the PCD process well drilling. The first AN approved was for aboveground plant
Read More

FID reached for Arcadia

The $400 million Arcadia investment is in addition to the $900 million invested in upstream developments in the Maranoa, Western Downs, Central Highlands and Banana regions of Queensland this year. “The
Read More

Oil and gas boosts economy by $27 billion: APPEA

“The economic footprint of the oil and gas industry goes far beyond its production wells and eight liquefied natural gas (LNG) plants,”? said APPEA Chief Executive Dr Malcolm Roberts. “Oil
Read More

Sole drilling progresses

The progress of Sole-3 has been affected by interruptions brought by heavy weather, With Cooper deciding to batch drill the top-holes of Sole-3 and Sole-4 to optimise workflow. This decision is expected
Read More

Glenaras closing in on production

Part of Galilee’s Glenaras Gas Project in ATP 2019 (formerly ATP 529) in the Galilee Basin in Queensland, the Glenaras-10L and -12L multilateral drilling campaigns were completed by the Easternwell
Read More

Santos rejects Harbour, terminates discussions

In a statement released by Santos, it rejected the bid “on the basis that it does not represent a full value of the company and, when combined with the associated risks, is not in the best interests
Read More

Central spuds Mereenie well

Spudded last night, the well is being drilled by Ensign Australia using its Ensign 932 drilling rig. The well aims to access the known gas that exists in the Stairway Formation, which overlies
Read More

Wood signs Gorgon deal extension

Effective immediately, the two-year contract extends an agreement in place since 2015 and will continue to be delivered by Wood in Perth. The scope of the agreement covers engineering, design, construction
Read More

Tamarama-3 hits gas

Drilling operations have indicated the presence of gas saturated Permian Toolachee and Patchawarra formations at the Tamarama-3 well. The petrophysical evaluation indicates the well has a combined net
Read More