Santos has successfully fracture stimulated the Tanumbirini 2H (T2H) and 3H (T3H) horizontal wells across 11 and 10 stages respectively within the targeted Mid-Velkerri B shale formation.
Read More
Tamboran completes T3H vertical section
Tamboran Resources has announced that the vertical section on EP 161 Tanumbirini 3H (T3H), in the Northern Territory, is complete, with drilling of the horizontal section to commence shortly.
Read More
Read More
Santos, Tamboran spud final Tanumbirini well
Tamboran Resources, on behalf of its joint venture partner Santos, has spudded the Tanumbirini 3H well (T3H) in the Beetaloo Basin, Northern Territory.
Read More
Read More
A political fix for a non-existent problem
According to APPEA, it will discourage much-needed investment in developing new gas supplies for Australian industry and consumers.
APPEA Chief Executive Dr. Malcolm Roberts said the water trigger is unnecessary
Read More
Read More
Industry welcomes minister reshuffle
Josh Frydenberg has been named as the Minister for the Environment and Energy while Senator Matt Canavan picks up the Resources and Northern Australia portfolio.
The Australian Pipelines and Gas Association
Read More
Read More
Turnbull calls emergency gas meeting
Budget review: cooking with gas
The Turnbull Government has allocated $5.2 million to a cost-benefit analysis study into the construction of gas pipelines from the Northern Territory and Western Australia to the east coast, through the
Read More
Read More
Prime Minister warns gas suppliers
The meeting heard that that the industry, including pipeline operators and generators, with AEMO, have developed a framework to make sure gas is delivered at times of peak electricity demand to prevent
Read More
Read More