Strike Energy

Strike, Talon on track for Walyering-5

Strike Energy and Talon Energy have commenced preliminary activities at the Walyering-5 well in the Perth Basin following encouraging initial production test results.
Read More

Mooring installation underway at Ichthys

The pile, measuring about 66 m long and weighing more than 450 t, was driven into the seabed in a water depth of 250 m. Ichthys Project Managing Director Louis Bon said that installation of the complex
Read More

Wood Group awarded FLNG contract

Effective immediately, Wood Group Kenny (WGK) will progress the configuration design of the flexible risers and umbilicals for the asset’s offshore gas-condensate fields – Brecknock, Calliance
Read More

Wood Group wins Shell Prelude FLNG contract

Perth-based Wood Group Kenny will provide specialist consultancy services for flexible riser integrity management prior to and during operation of Prelude FLNG, which will be located 475 km north-north
Read More