Buru Energy has installed a 7-inch casing at the Canning Basin Rafael 1 well, which has been successfully run and cemented to 3868 meters before the well benign drilled ahead in 6-inches hole. Read More
Triangle Energy has begun a front end engineering design (FEED) study for a proposed 5000 barrel per day modular, flexible feed renewable fuel refinery (RFR) in Western Australia. Read More
Tellus’ Australian-first commercial hazardous waste geological repository in Western Australia offers the resource industry a safe, permanent and proven outlet for their hazardous waste disposal. Read More
A casing running operation is currently underway for Buru Energy’s Rafael 1 conventional oil exploration well in the Canning Basin, Western Australia. Read More
Woodside, BP, and Japan Australia LNG (MIMI), which is owned equally by Mitsubishi and Mitsui, have agreed to form a consortium to progress feasibility studies for a large-scale, multi-user carbon capture and storage (CCS) project near Karratha in Western Australia. Read More
Warrego Energy has commenced payments to Australian Gas Infrastructure Group (AGIG) to facilitate the procurement of long lead items (LLIs) required for construction of the 87 TJ/d gas processing facility, consistent with the project’s timeline for first gas in the second half of 2023. Read More