Dorado

Santos awards Sapura Dorado contract

Santos has awarded the front end engineering design (FEED) contract for the design, construction and installation of the Dorado project’s wellhead platform (WHP) to Sapura Energy. The WHP will be an
Read More
Cliff Head

Triangle back on track with Cliff Head well

Triangle Energy, on behalf of the joint venture, has advised that the CH-6 well at the Cliff Head oil field, offshore Western Australia, has returned to production. The workover program of the CH-6 well
Read More
Dorado

Altera awarded Dorado FEED contract

Santos has awarded the front end engineering design (FEED) contract for the floating production, storage and offloading (FPSO) facility for the Dorado project offshore Western Australia, to Altera Infrastructure.
Read More

ABB secures $120 million contract with Chevron

Chevron Australia and Aker Solutions have appointed ABB to provide power from shore and subsea long step-out to the Jansz-Io field, Western Australia. The $120 million contract will see the company supply
Read More

Buru prepares for Rafael well

Buru Energy has advised that the Ensign 963 drilling rig is currently being rigged up at the Rafael-1 well location after being moved the Currajong-1 well in the Canning Basin, Western Australia.
Read More
West Erregulla-3

WE5 headline production rates impaired

Strike Energy has reported that the initial flows indicated at West Erregulla 5 well indicated a production barrier that the reservoir was unable to overcome through prolonged flow testing.
Read More
Julia Creek

Pilot Energy secures South West work program approvals

Pilot Energy has received confirmation that the Western Australian Department of Mines, Industry, Regulation and Safety (DMIRS) has approved amendments to the minimum work commitments and durations of its South West oil and gas tenements.
Read More
Triangle Energy

Triangle, Key Petroleum extend date for WA acquisition

Triangle Energy has extended the cut off date for the sale and purchase agreement with Key Petroleum to acquire its 50 per cent interest in production licence L7(R1) and its combined 86.94 per cent interest in exploration permit EP 437.
Read More