, , , , , , , ,

Tamarama-3 hits gas

Drilling operations have indicated the presence of gas saturated Permian Toolachee and Patchawarra formations at the Tamarama-3 well. The petrophysical evaluation indicates the well has a combined net pay of 58.9 m true vertical thickness (TVT), being 11.6 m of net sandstone gas pay (from a gross 41 m TVT) in the Toolachee Formation, and …
To access this post, you must purchase a subscription. If you have an existing subscription, please log in.
Send this to a friend