Norwest Energy has advised that operator Energy Resources has commenced production testing operations at the Lockyer Deep-1 gas discovery well in the Perth Basin.
Read More
Strong gas flows achieved at Lockyer
Norwest Energy has advised that in preparation for production testing for its Lockyer Deep-1 conventional gas discovery well, perforating operations were conducted from 10-12 March.
Read More
Read More
Norwest to commence testing and seismic operations
Norwest Energy has announced that the Lockyer Deep-1 well is now conditioned for perforation in the Kingia reservoir interval, having established the desired level of ‘underbalance’.
Read More
Read More
Lockyer testing and seismic operations underway
Lockyer Deep-1 operator Energy Resources is preparing to perforate the well in order to begin production testing and obtain a sample of gas from the King reservoir.
Read More
Read More
Norwest Energy prioritises Lockyer
Oil and gas explorer Norwest Energy spent the December quarter focused on the Lockyer Deep-1 Gas Discovery.
Read More
Lockyer Deep discovery exceeds pre-drill expectations
Norwest Energy has had a “truly transformational” 12 months, according to managing director Iain Smith.
Read More
Norwest boosts Lockyer Deep-1 well
Norwest Energy has announced an increase in potential resource area for the Lockyer Deep-1 well, Western Australia.
Read More
Rig released from Norwest’s Lockyer well
Norwest Energy has suspended product testing at its Lockyer Deep-1 well as the rig is released from site.
Read More
Read More
Lockyer restart plan in the works
Norwest Energy has successfully obtained a cement bond log for the Lockyer Deep-1 well, which is part of a plan to continue using the Ensign Rig 970 at the Western Australian project.
Read More
Read More
Troubles at Lockyer
Perth Basin oil and gas explorer Norwest Energy said that milling operations have successfully removed cement from within the 5-1/2-inch casing from a depth of 2,420 m to just above the casing float collar.
Read More
Read More